-->

Govt assures completion of Ampati Engineering College

Date:

Share post:

Shillong, Sept 11: Education Minister Rakkam A Sangma on Thursday assured that the government is committed to complete the construction of the Ampati Engineering College.

Replying in the Assembly, Sangma informed that the physical progress of the Ampati Engineering College construction stands at 25%, with a total expenditure of Rs 15 crore till date.

“I assure that on a war footing we will ensure we complete Shillong and Ampati engineering college,” he said.

The assurance was made after the Leader of Opposition Mukul Sangma had urged the government to complete the project on a war footing.

TMC Ampati legislator Miani D Shira raised concerns about the lack of an approach road to the Ampati Engineering College.

The Education Minister responded that a temporary road needs to be constructed by the contractor, which gets washed away during rains.

He assured that the government would take up the matter for construction of the road.

Share post:

-->
spot_img

Popular

More like this
Related

Pynkut ka Sorkar ia ka interview ha ka kam Group-C non-technical, mynjur ia ka SOP ki DSC

Shillong, Nailar 26 : Ka Kynhun Myntri ka Sorkar...

Pynlait ka Sorkar Pdeng T.17.85 klur sha ka project ban pynduna jingktah ka pluh khlaw bad pom pyrthat

Shillong, Nailar 26: U Myntri ka Tnad Revenue and...

Palat 1800 tylli ki kam tuh ha Meghalaya naduh u 2025 | Bun eh ha EKH, ong ka Sorkar

Shillong, Nailar 26: U Symbud Myntri Rangbah ba khmih...

Baljek airport will be operational by Sept, told Aviation Minister it’s the gift I want: CM

SHILLONG, AUG 26: Chief Minister Conrad K Sangma on...