spot_img

Conrad inaugurates 7.5 MW Unit of Ganol Hydro Power Project in West Garo Hills

Date:

Share post:

Shillong, Jan 4: Meghalaya Chief Minister Conrad K Sangma on Wednesday inaugurated the 7.5 MW Unit of the 22.5 Mega Watt Ganol Hydro Power Project at West Garo Hills District that was left pending since 2014.

Power Minister Prestone Tynsong, Cabinet Minister James K Sangma, MLA Thomas A Sangma were present at the inauguration programme along with the Chief Minister.

“Power generation has been a hurdle in Garo Hills region especially during dry winter months. The commissioning of the Ganol Hydro Power Project will largely meet the peak electricity demands. I congratulate the Power Department, team Meghalaya Energy Corporation Limited and everyone who are working hard to complete this historic project. I dedicate it to the people,” said the CM in his social media post.

Share post:

spot_img
spot_img

Popular

More like this
Related

134th Durand Cup | Pynliem ka Malaysian Armed Forces ia ka Rangdajied da ka shi kol

Shillong, Nailar 05 : Ka kol kaba la wan...

Aiti ka Sorkar mar T.10,000 sha ki nongshong dukan madan ba pynkynriah na Khyndailad

Shillong, Nailar 05: Ka Sorkar Jylla hynne ka sngi...

Pan jubab ka Iingkashari na ka SMB ba kynnoh pynduh CoV ia ki nongshong dukan madan

Shillong, Nailar 05 : Ka Iingkashari Meghalaya High Court...

Pdiang sngewbha u Conrad Sangma ia ka jingwan pyniasoh NPP u MLA ka Mylliem

Shillong, Nailar 05 : U National President ka National...