-->

Deputy CM inaugurates new Umiam Dam road and bridge for Heavy Vehicles

Date:

Share post:

Shillong, May 13 : Meghalaya Deputy Chief Minister in charge of the Public Works Department (PWD), Prestone Tynsong, on Wednesday inaugurated the newly constructed road and bridge near Umiam Dam, developed specifically for the movement of night super buses and other heavy vehicles.

The newly built bridge, measuring 75 metres in length, along with a 2.260-kilometre road stretch, has been constructed along the lower side of the existing Damsite bridge, where the movement of night super buses and heavy vehicles had been temporarily restricted.

The new infrastructure is expected to ease traffic movement and improve connectivity for heavy vehicles travelling through the area.

Also present during the inauguration were PWD Commissioner and Secretary Sanjay Goyal, the Chief Engineer of the PWD, the Deputy Commissioner of East Khasi Hills, the Additional Deputy Commissioner of Ri Bhoi, Superintendents of Police from both districts, departmental engineers, government officials, local leaders and residents.

Share post:

-->
spot_img

Popular

More like this
Related

Meghalaya targets global jobs, entrepreneurship with new skill development drive

Chief Minister Conrad K. Sangma says nearly 60,000 youth...

“Ka por kala dei ban ai jingithuh ia ki Nurse ba iada ia jingim briew”, ong u Director ka NEIGRIHMS

Shillong, Jymmang 13: U Director ka NEIGRIHMS Prof. (Dr.)...

Dawa ka JSU ia ka Sorkar ban pyniasoh ia ka surok Bataw RBBJ sha ka High Speed Corridor

Shillong, Jymmang 14 : Ka Jaintia Students’ Union-South Border...